by engineering | Sep 29, 2017 | certified template-group, FAQ General-Group
General Category The Tracker IPm currently can control 2 axis’ simultaneously. These can be 1 Elevation & 1 Azimuth or 2 Elevation....
by engineering | Sep 29, 2017 | certified template-group, FAQ General-Group
General Category The Tracker IPm uses the NREL Solar Positionin ALgorithm which calculates the sun’s position based on Latitude, Longitude, elevations and time of day. This calculation is compared to a feedback from an inclinometer for the Zenith Elevation and a...
by engineering | Sep 29, 2017 | certified template-group, FAQ General-Group
General Category If your design has the controller and relays at some distance from the motor and you will be running the risk of diminished voltage of the DC power as the distance increases. There are very good Voltage Drop Calculators on the web such...
by engineering | Sep 29, 2017 | certified template-group, Networking-Group, Trouble Shooting Networks-Group
Network Troubleshooting When the IPm is powered and connected to the network all Ethernet Com LEDs should have the following states: PWR – (Power) ON Solid If the IPm is configured for DHCP and the network DHCP server does not assign an IP address, the DC Power...
by engineering | Sep 29, 2017 | Customer Support-Group
General - FAQ How do I know which LED represents what terminal? How does the Tracker identify the sun’s position? How many axis’ can a tracker control? What is the maximum distance the power signal can travel in a cable? Why does the tracker reach 45 deg....
Recent Comments