by Alex Bryant | Aug 27, 2019 | 2400 Wiring Diagram-Group
Field Installation Calibration Once the panel and tracker have been installed, the tracker will need to be calibrated. Please follow the steps below to calibrate. Configuration - 2400 Series Open up GRIDview to the page that contains all available listed...
by Alex Bryant | Dec 13, 2016 | Uncategorized
”To Note This assumes that all Location and both axis Motor set up has been completed, wiring is completed and you are ready to track the sun Getting Started Connect your Tracker to the Internet via the Ethernet port on the top of the module. Make certain that...
by Alex Bryant | Dec 12, 2016 | 2 Axis Installation, 2 Axis Installation-Group
Start Procedure - Click Arrow > Open Project With your latest version of tool kit open File / Open Project Go to the folder where you placed the project file. Select the file then Open Serial Connection You may connect to your Tracker IPm by either serial or...
by Alex Bryant | Dec 12, 2016 | 2 Axis Installation-Group, Brushless Motor-Group, Getting Started, Quick Start Guides
Start Procedure - Click Arrow > WARNING This is only recommended for experienced users. For less experienced users we recommend configuring via IPWebcontrol NOTE The following assumes that Sixnet toolkit is installed on the computer and that the user is...
by Alex Bryant | Dec 8, 2016 | Uncategorized
Start Procedure - Click Arrow WARNING: This is only recommended for experienced users. For less experienced users we recommend configuring via IPWebcontrol Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6 Figure 7 Figure 8 Figure 9 NOTE : The following...